The Elevação Construction was responsible for the work on the station that increases the sewage treatment capacity from 175 liters/second to 300 liters/second.
Final Sludge Dewatering Unit (Decanters): two centrifuges to operate with a flow of 6.0 m³/h in a daily period of 12 hours to 24 hours.
ABOUT THE WORK
Social impact of the work: With the expansion of the Joaçaba Water Treatment Station, 99.03% of the population now served with water supply, compared to the average of 89.97% in the state and 83.71% in the country.