Constructora Elevação

SANEPAR WATER TREATMENT STATION | CAMPO LARGO (PR)

In 2016, we carried out the work to expand the Lago Rio Verde Production System, the Water Supply System, with the Supply of Materials and Equipment.

ABOUT THE WORK

In addition to the Water Treatment Station, a RESERVOIR supported by REINFORCED CONCRETE  built and the existing BOOSTERS renovated.

● Treated Water Pump: 525 liters/sec
● 100% Integrated Supervision and Control System
● 100% Automated
● 15 months of Pre-Operation and Assisted Operation
● 37 remote areas: Pressure, flow, and boosters
● Innovation: Process of treatment by double filtration, unprecedented in Paraná.
● Value of the work: R$40 million.

CLIENT: SANEPAR
SEGMENT: SANITATION
LOCAtion: CAMPO LARGO/PR

  • Clients:
    Sanepar
  • Category:
    Sanitation
  • Date: