SABESP SANITARY SEWAGE SYSTEM | TREMEMBE/TAUBATE (SP)
The Elevação Construction was responsible for the Construction of the Sanitary Sewage System for the cities of Taubaté and Tremembé/SP.
ABOUT THE WORK
With an investment of R$ 100 million, the Treatment Station and respective pipes built, most of them using a non-destructive method.
Using 400 tons of steel, 7,000 m³ of concrete and transporting 4,000,000 m³ x km, the work conceived by the winning project of the National Water Agency (ANA) Annual Award. The Elevação Construction also carried out the pre-operation and assisted operation of this system.