SABESP SANITARY SEWAGE SYSTEM | SUZANO/RIBEIRÃO PIRES (SP)

The Elevação Construction was responsible for the execution of the works for the Complementation and Adaptation of the Sanitary Sewage System of the 4th Division and Tanque Caio, in the Municipality of Ribeirão Pires / Ikeda and Planalto in the Municipality of Suzano.

ABOUT THE WORK

EEE-FOURTH DIVISION

Maximum flow: 136.8 m³/h
Head height: 89.3 mca
Number of pumps with power and operating regime: P = 86kW (1+1)

EEE-TANQUE CAIO

Maximum flow: 137.12 m³/h
Head height: 50.35 mca
Number of pumps with power and operating regime: P = 43kW (1+1)

EEE-IKEDA

Maximum flow: 313.7 m³/h
Head height: 52.7mca
Number of pumps with power and operating regime: P = 86kW (3+1)

EEE-PLANALTO

Maximum flow: 450.0 m³/h
Head height: 69.0mca
Number of pumps with power and operating regime: P = 132kW (3+1)