Constructora Elevação

GASMIG GASODUCT | JECEABA (MG)

In 2009, the Elevação Construction carried out the special work to cross the Transpetro pipeline; with drilling in Load (drilling) DN16”, installation of the SKID of the Measuring and Pressure Regulation Set.

● Diameter: 14″
● Length: 6,833 meters
● Material: API 5L Grade B Steel
● Drilling: 16”

CLIENT: GASMIG
SEGMENT
: GAS PIPELINE
LOCATION
: JECEABA/MG

  • Clients:
    GASMIG
  • Category:
    Oil, Gas and Ethanol
  • Date: