In 2009, the Elevação Construction carried out the special work to cross the Transpetro pipeline; with drilling in Load (drilling) DN16”, installation of the SKID of the Measuring and Pressure Regulation Set.
● Diameter: 14″ ● Length: 6,833 meters ● Material: API 5L Grade B Steel ● Drilling: 16”
CLIENT: GASMIG SEGMENT: GAS PIPELINE LOCATION: JECEABA/MG