The Elevação Construction was responsible for the execution of the works for the Complementation and Adaptation of the Sanitary Sewage System of the 4th Division and Tanque Caio, in the Municipality of Ribeirão Pires / Ikeda and Planalto in the Municipality of Suzano.
ABOUT THE WORK
EEE-FOURTH DIVISION
Maximum flow: 136.8 m³/h Head height: 89.3 mca Number of pumps with power and operating regime: P = 86kW (1+1)
EEE-TANQUE CAIO
Maximum flow: 137.12 m³/h Head height: 50.35 mca Number of pumps with power and operating regime: P = 43kW (1+1)
EEE-IKEDA
Maximum flow: 313.7 m³/h Head height: 52.7mca Number of pumpswith power and operating regime: P = 86kW (3+1)
EEE-PLANALTO
Maximum flow: 450.0 m³/h Head height: 69.0mca Number of pumps with power and operating regime: P = 132kW (3+1)
CLIENT: SABESP SEGMENT: SANITATION LOCATION: SUZANO E RIBEIRÃO PIRES/SP